Error message

  • Warning: Illegal string offset 'field' in DatabaseCondition->__clone() (line 1895 of /home2/geiger/public_html/includes/database/query.inc).
  • Warning: Illegal string offset 'field' in DatabaseCondition->__clone() (line 1895 of /home2/geiger/public_html/includes/database/query.inc).
  • Warning: Illegal string offset 'field' in DatabaseCondition->__clone() (line 1895 of /home2/geiger/public_html/includes/database/query.inc).
  • Warning: Illegal string offset 'field' in DatabaseCondition->__clone() (line 1895 of /home2/geiger/public_html/includes/database/query.inc).

Sports Facilities

The Minnesota Vikings’ new home, US Bank Stadium in Minneapolis, is recognized for its lightweight, steeply-sloped, long-span roof. To keep the roof structure as light as possible, it was decided to ensure that it would shed snow. But with a roof elevation of...

Geiger Engineers designed the mechanical systems that operate the new retractable roof on Arthur Ashe Stadium, the USTA's center court for the U.S. Open. The roof consists of two retractable panels each covering an opening nominally 232 feet wide. These two panels move...

The United States Tennis Association (USTA) engaged Geiger Engineers to provide Structural Engineering Services for their West Campus Improvement Project, part of a campus-wide expansion plan at the Billie Jean King National Tennis Center. Three new courts - 4, 5, and 6...

Geiger Engineers studied the feasibility of enclosing and air-conditioning the existing Mohammed Bin Zayed Stadium. This existing 40,000 seat stadium is the home of Al Jazira Sports & Cultural Club. Two design concepts were developed and priced. Both schemes...

Geiger Engineers consulting to Birdair, Inc., provided the structural and envelope engineering for the Talisman Centre's design-build roof replacement. The Talisman Centre is one of the largest multi-purpose, enclosed sports and recreational facilities in North America....

The Purcell Pavilion is a 59,000 sq ft structure providing a new entry to the existing Joyce Center Arena with added club facilities, a team store, and improved patron amenities including ticketing. Additionally, the retractable seating forming the arena's entire upper...

Geiger Engineers was engaged to design a replacement long-span roof for the Littlejohn Coliseum as part of its renovation. Geiger developed a new truss structure utilizing the original roof layout of 300 x 300 ft (90 m x 90 m). The new roof is designed to allow rigging...

This facility for the College of Charleston includes an arena with a 5,000-seat capacity for varsity basketball. The 17,500 sq m (188,000 sq ft) project was constructed on a tight urban site in downtown Charleston and is tied into the college's existing physical education,...

The first phase of a large athletic complex, this facility is designed for athletic events and training. The center includes a 3,000 seat gymnasium and a suspended indoor track. The center is connected to the existing athletic facility through a central three-story lobby...

Xcel Energy Center, nicknamed "The X", is home to the Minnesota Wild, St. Paul’s NHL franchise. The arena seats 19,000 including numerous luxury suites and club seats and hosts a wide variety of entertainment and spectator events. The roof is a unique two-way truss...

Pages